Human-AI Resourcing
PMOs are told to put AI agents on real projects now, but Primavera P6, MS Project, and every PM tool built after them still treat a "resource" as a person with a calendar. Nobody plans human and AI capacity in the same pool.
Who has this problem
PMO leads at mid-to-large enterprises
Running Primavera P6 or MS Project schedules that now include AI agents doing real task work, with no field for it.
Project managers on hybrid human-AI teams
Can't tell from the tool which output came from a person and which came from an agent on the same project.
Construction and engineering PMOs
Heaviest Primavera P6 users, where resource-loaded schedules already drive cost and timeline decisions.
RevOps/PMO consultants
Firms like RSM already advising clients to run parallel human and AI capacity plans, without a tool built for it.
Signal timeline
RSM tells enterprise clients to stop building a single headcount plan and instead run a human FTE plan and a separate AI agent capacity plan side by side, tracking agent licensing, compute, and oversight labor as real costs.
Keep reading with access
You've seen the scores, who has this problem, and the latest signal. Members get everything behind it.
- 3 dated, sourced signals
- 2 pieces of hard evidence
- 4 builders and where each falls short
- 1 chart or table
- 5 linked sources
Already a member? Log in
Signals are specific dated events, each linked to its source and reviewed before entry. The read is editorial interpretation, not financial or investment advice. Do your own diligence before building or investing.